Djibouti Railway

Djibouti Railway


Project name: Djibouti Railway Station Waterproofing Materials
Case Description: The project is the 3rd, 4th and 5th sections and the section within Djibouti of the new railway from Addis Ababa, the capital of Ethiopia, to the Port of Djibouti, with a total length of about 430 kilometers. Adopting Chinese standards, it is the first cross-border electric railway project planned, designed, financed and implemented by Chinese enterprises. The project uses Chinese products from track materials, construction equipment, to communication signals and electrification equipment, locomotives and vehicles.
Materials used: "Yu Neng" brand YN-B708 APP self-adhesive modified asphalt waterproofing membrane, YN-C801 non-tar polyurethane waterproofing coating, YN-C805 polymer cement waterproofing coating, etc.
Function: Railway waterproofing
project status: completed