高分子防水卷材白

YN-A685 EPDM waterproof membrane

Implementation standard:GB 18173.1-2012

Specifications:Thickness: 1.2 mm / 1.5 mm/2.0 mm, Width: 1.0 m, Length: 20 m

This product is a single-layer synthetic polymer rubber waterproof membrane with excellent homogeneity and performance. It is mainly made of EPDM rubber, with reinforcing agent, plasticizer, antioxidant, vulcanization accelerator and other processing aids added. It is made through the processes of mixing, cooling, filtering, vulcanization, extrusion, pressurized continuous vulcanization and inspection.

Product Features
  1. The modified structure effectively solves the shortcomings of adhesive overlap;
  2. Excellent anti-aging performance, service life of roof environment≥ 20 years,underground environment up to 50 years;
  3. High elongation, high tensile strength, and small dimensional change after heat treatment;
  4. Resistant to plant root penetration, can be used as a waterproof layer for planted roofs;
  5. Good flexibility at low temperature and can adapt to changes in ambient temperature;
  6. Convenient construction, firm and reliable overlap, no environmental pollution;
  7. Resistant to chemical corrosion, can be used in special occasions;
  8. Easy maintenance and low cost;
  9. Easy to handle details;
  10. Good perforation resistance.
Scope of application
It is suitable for roof and underground waterproofing projects of industrial and civil buildings such as reservoirs, municipal buildings, subways, tunnels, etc., and is especially suitable for key waterproofing projects with high requirements for durability, corrosion resistance and easy deformation.
Precautions
  1. Do not lay the roll material in rainy, snowy, foggy, windy weather or when the base surface is wet;
  2. When laying waterproof membrane, the construction temperature should be 5-35℃ and the relative humidity should be less than 80%;
  3. During the construction process, each process must not be crossed, and all nodes must be reinforced;
  4. It is strictly forbidden to approach fire and heat sources during construction;
  5. Construction should be completed on the same day, and unfinished areas should be protected in time to avoid contamination by dust, rain, and oil stains;
  6. Under normal conditions, the storage period is one year from the production date.